Saturday, April 21, 2012

Quilting Thoughts

Current projects:
-- the maple leaf/log cabin quilt that I'm currently working on as well as
-- the Craftsy' BOM. 
-- Mel's top is waiting to be machine quilted
-- quilting frame is waiting to be finished and put together
-- quilting room is waiting to be moved from 2nd floor to 1st floor (putting guest room on 2nd flr)

Then there are a number of quilting projects I'd like to do:
-- vest (for me)
-- a couple wall hangings (Christmas Wreath and Christmas Tree)
-- string quilt blocks -- a couple a month so in a year or so I'd have enough for a quilt
-- wall hanging for a children's day care center in NH
-- lap quilt for my nephew Matt
-- lap quilt for my nephew Mark

In between all of this I need to work a full-time job; clean my house (hubby's threatened to enroll me in a Molly Maid's course -- dusting is just not my thing); plan, prepare and plant a veggie garden; tend to my knock-out roses, and bushes; help hubby with some yard work; exercise, eat right, grocery shop, laundry, dishes, etc. and enjoy life.

Now that I've written down what I have to do.  I need to make a plan to get them done.

Oh yes, I also have to get my tush to the local church and join as I've been talking about doing this since we moved to Ohio in 2007!  There's a Nazarene church down the street from my house that looks inviting.  I also want to join the local quilt guild especially now that it's about 10 minutes from where I work (meets 1st Monday of the month).

Craftsy April B.O.M.

Working full-time and trying to keep up with all that I want to do isn't easy.  However, housework gets set aside for quilting.  I mean, a girl has to do what a girl has to do.


This month we were thrown a challenge. We could do anything we wanted with the hexagons instead of the sunrays. So the first one I did was, of course, the challenge.

A grandmother's flower garden which is appropriate because I am a grandmother who needs a flower garden. The next one is the hex stripe which was fairly easy to do. 




And then I decided to do the sunrays as well.  I have some red-orange fabrics left from a quilt I did long ago and thought they'd look nice as my sunrays. As you can see, I need to finish tacking down the rays.  It was late when I was working on this and I think I needed to re-do the bobbin thread.

Here you have all three of them together. 

Sunday, April 8, 2012

Happy Easter!

Today was a relatively quiet day for us.  The kids are unable to come over for Easter and I have yet to find a home church so... I did a little quilting, tried a new tuna steak recipe for dinner as well as attempted to make pumpkin flans for dessert for hubby and me. 

I've been busy with work which accounts for the lack of updates.  I've also enjoyed this month's Craftsy block-of-the-month which is English Paper Piecing.  I'm a little surprised at that as I've been avoiding paper piecing but it was a nice change.  I wouldn't want to do a whole quilt in paper piecing but a block or two or a wall hanging would be do-able for me.

The BOM included a sunbeam or you could do a challenge block using the hexagons.  So I haven't done the hex stripe (working on it though honest), but I jumped to the challenge and did a Grandmother's Flower Garden which I call "Out of Place".


.
 Called "Out of Place" because sometimes, like the odd pink petal, I feel out of place even though I may fit in to my surroundings.  This took pretty much all week as it's hand-pieced.  I did machine stitch it to the background fabric around the outer green edge and both edges of the pink round.  I am looking forward to doing the other two blocks for this month when I can squeeze it in.

It's been a busy month with the new job and hubby has been traveling off and on for work.  Last week I also managed to catch a cold he brought home with him and was battling that.  *fun**fun*

This coming week, I will be taking a couple of exercise classes being offered through work after hours.  Pilates and Zumba!  I had originally signed up for three (Body Blast -- cardio) but figured since I've been fairly inactive all winter long, I'd better take it easy.

I need to get ready for the work week by tending to the ironing (at least some of it).  Hope everyone has a blessed week.

Thanks for stopping by!

Saturday, March 17, 2012

Nice End to a Hectic Week!

Hur-rah!  I began a new job Monday after being unemployed for a few months.  With the time change and all the walking at the new job (learning my way around plus the parking lot was a short distance from the building), by Friday, I was exhausted.  I wasn't used to getting up and out of the house in the mornings, and missed the opportunity to take an afternoon nap.  *laugh*  Here is a picture from when I exit the building to the stairs I have to climb to get to where I park my car. 

Good news is that I dropped 1.8 lbs from Monday morning. *laugh* Forced exercise... gotta love it!

Thursday night I tidied up the house in preparation for my grand daughter's arrival (and her parents of course).  She is constantly on the go and loves to run. Being almost two (turns two in April), she is inquisitive and wants to check everything out. So the boxes in the living room and kitchenette area had to go to the basement.
Friday evening it was nice to come home and find them here.  We celebrated her birthday as she'll be in New England celebrating with her cousins next month and *sniff sniff* grandma and grandpa won't be able to get the time off to join them.  So her other grandparents will have the fun.
Not much quilting has been done this week or this weekend although I'm hoping to get upstairs before the night is over. 
*sigh*  Unfortunately the visit ended too soon.  I'm looking forward to the time when we will be able to have her for week long sleepovers.  That will be fun!  We did spend time visiting with her parents as we haven't seen them in a while either. 

Happy St. Patrick's Day to all the Irish and non-Irish among us!

Friday, March 9, 2012

Quilting Break

Technically it's not a break from quilting.  It's a break from the maple leaf/log cabin quilt as it continues to grow.  I've decided to add additional blocks to the interior and then I'm changing up the border rows too. 

My friend Janet and I follow the Craftsy BOM.  Here are my March blocks:
String quilts -- Craftsy March Block of the Month
I dug into my stash for the maple leaf/log cabin quilt as that is a scrap quilt too.  I think it came out nicely. 

April's Craftsy BOMs are paper pieced -- I have been avoiding paper piecing forever!  Hopefully it won't be as difficult as I envision.

Have a blessed day!

Monday, March 5, 2012

Maple Leaf Blocks

This past week I've been busy with the maple leaf blocks plus routine household tasks (tends to get in the way of quilting but needs to be done).
Chain piecing half square triangles Sunday night

Friday I spent 1.5 hours putting together 10 blocks only to spend another 1.5 hours ripping out and correcting six of them because I had reversed two blocks.  Ugh! 

This past weekend I had hoped to spend a huge chunk of time quilting but alas that was not to be the case.   I did get to spend about one hour chain piecing the half square triangles together.  Now to move on to the stem blocks and putting the blocks together correctly. 

Getting ready to make the stem blocks -- blocks laid ready to piece
The goal is to work at least two hours on quilting today and getting the 21 blocks done!  Then I can move on to the log cabin portion of my quilt.   Psyched! 

Oldest and his family will be here in two weeks and I start a new job next Monday which will definitely cut into my quilting time but will give us the resources we need.

Happy Quilting!

Wednesday, February 29, 2012

What I've Been Up To

My oldest and his family will be down in a couple of weeks and I don't have proper bedding for them so ... what's a quilter to do.  *grin*

I have some blocks (14) that I received in a swap I did about 10 years ago and couldn't figure out what to do with them.


I've decided to make a quilt with them.  It will be queen size so more blocks are required.  I was thinking of adding some blues and greens but find I prefer the autumn colors.

I decided to add some 'dark' maple leaf blocks -- need about 36
Right now the plan is to alternate the maple leaf blocks with either plain blocks or half square light/dark triangles to speed the process along.  Originally I thought log cabins would look nice set in rows and I still might do that. 

My work/sewing table with strips, sets and blocks ready to go.
Need to close so I can get working on the quilt... first a run to the bank (real life demands attention). 

Blessings to you and yours ~~